Services
Mooring Hawser
Mooring hawser assembly inspection , maintenance and replacement.
Off-buoy chains, shackles, hawser, support buoy, chafe chain, and pick-up ropes
Pre-Installation
- Engineering analysis with OrcaFlex to check suitability (e.g. tanker size, buoy/FPSO weight, sea state, etc.)
- Develop final spec for procurement
Procurement - Utilize engineering design report to develop MTO
- Interface with suppliers
- QA/QC
Installation
- Mooring hawser assembly build at Port
- Interface with Port & client personnel
- Offshore transfer on boat deck
- Tandem/SPM Buoy hook-up
- Pull test
Post-Installation
Develop & Execute Preventive Maintenance Plan (out-of-water full inspection, pre & post export checks, other time-based checks)
CVI of terminal points
Retirement plan (per frequency of export or OEM guide)