Subsener

Services

Mooring Hawser

Mooring hawser assembly inspection , maintenance and replacement.

Off-buoy chains, shackles, hawser, support buoy, chafe chain, and pick-up ropes

Pre-Installation

  • Engineering analysis with OrcaFlex to check suitability (e.g. tanker size, buoy/FPSO weight, sea state, etc.)
  • Develop final spec for procurement

    Procurement
  • Utilize engineering design report to develop MTO
  • Interface with suppliers
  • QA/QC 

Installation

  • Mooring hawser assembly build at Port
  • Interface with Port & client personnel
  • Offshore transfer on boat deck
  • Tandem/SPM Buoy hook-up
  • Pull test

Post-Installation

Develop & Execute Preventive Maintenance Plan (out-of-water full inspection, pre & post export checks, other time-based checks)
CVI of terminal points
Retirement plan (per frequency of export or OEM guide)

Scroll to Top